Transport Warehouse Concrete Flooring

Client:

Frampton’s Transport Warehouse

Location: 

Frampton’s Transport Warehouse Shepton Mallet

Area:

7097m2 @ 275mm Concrete 1952m3

Methodology:

Co-ordinate all stages of industrial flooring project to specification & deadline

Introduction:

Nationwide Concreting were asked to undertake a concrete floor installation for a new transport warehouse in Shepton Mallet for Ken Biggs Contractors Ltd. Supplying all labour (19 operatives) and plant to instal concrete floor slabs measuring approximately 7097m2.

Production process:

The mesh reinforcement we used for the floor was a double layer of A252 and using Reydon Gas membrane which was taped and sealed using double sided Visqueen tape, with a 75mm steel chair between the two layers of mesh with a 50mm plastic spacer on the bottom layer.

The finish on the concrete floor was a full shined Powerfloated finish which we had to finish to a high standard of an FM2 finish. An FM2 finish is for buildings containing wide aisle racking with stacking or racking over 8m high, free- movement areas and transfer areas.

We used Morris & Perry Ltd for Concrete and had a great supply throughout the job the mixed we used on this occasion was as follows: C40 Cem II B – S.


Contact our concrete contractors

We are the leading concrete flooring contractors in the UK, offering outstanding concrete finishing results with every project. For more information about our services, contact our team today on 01590 676 585.

This site uses some unobtrusive cookies to store information on your computer. By using our site you accept our Terms And Conditions and Privacy Policy. ×