Marbank Construction Ltd
Cambridge
6,107m2 of concrete - ground floor slab, mezzanine and undercroft.
Co-ordinate all stages of industrial flooring project to specification & deadline (5 pours).
Our team of concrete finishers recently completed this concrete flooring installation for an industrial project in Cambridge, on behalf of Marbank Construction Ltd. The project required 6,107m2 of concrete in total, covering a ground floor slab, mezzanine floor and undercroft. As the concrete floor needed to be of industrial strength, we reinforced the 155mm thick concrete with a layer of A142 mesh laid onto a fully sealed lapped and tapped gas membrane.
The use of reinforcing mesh greatly improves the durability and compressive strength of the concrete floor, whilst the installation of a gas membrane helps to prevent harmful gases migrating from the ground soil, through the concrete and into the establishment. Without a gas membrane in place, exposure to these gases can pose a health and safety risk.
Our team of concrete finishers began the project by installing the 5,241m2 concrete floor slab in four pours, followed by a 866m2 pour for the mezzanine floor and undercroft. Both sections of concrete floor utilised our Ligchine Boss laser screed machine and were completed using a power float finish. The result is a durable, polished concrete floor capable of withstanding high-traffic and heavy loads.
We are the leading concrete flooring contractors in the UK, offering outstanding concrete finishing results in Cambridge. For more information about our services, contact our team today on 01590 676 585.