Barnwood Construction
Honeybourne Place, Cheltenham
7,588m2
Installation of CF60 1.2mm Gauge Metal Decking and 19x95mm Welded Studs
We recently completed this metal decking project for Barnwood Construction in Honeybourne Place, Cheltenham. The project required six levels and was split into three phases. One of the difficulties of the project was the available space, as the site is located in the centre of Cheltenham and right next to a large Waitrose.
Our metal decking department liaised with them and the delivery companies in order to ensure that there were no issues with incoming deliveries. Our concrete flooring team followed after each phase was decked and studded, laying B785 mesh & B1131 mesh to all perimeters then A252 throughout. We are also undertaking the Ground floor slab which consists of 80+t Bar Reinforcement.
We are the leading concrete flooring contractors in the UK, offering outstanding metal decking and concrete finishing results with every project. For more information about our services, contact us today on 01590 676 585.