Concrete Floor and Extension Midsomer Norton

Client:

Dickies factory

Location:

Dickies factory in Midsomer Norton

Size & method:

3344m2 / 818m3 concrete pump powerfloat finish. FM2 finish

Methodology:

Co-ordinate all stages of an industrial flooring project to specification & deadline

Introduction:

Nationwide concreting were asked to undertake a concrete floor installation for an extension at the Dickies factory in Midsomer Norton. Supplying all labour (16 operatives) and plant to pour concrete floor slabs measuring approximately 3344m2 over 4 pours.

Production process:

The mesh reinforcement we used in the concrete floor was a double layer of A252 with a 1200gauge membrane with taped overlaps, with a 75mm steel chair between the two layers of mesh with a 50mm plastic spacer on the bottom layer.

The finish on the concrete floor was a full shined finish which we had to finish to a high standard of an FM2 finish. An FM2 finish is for buildings containing wide aisle racking with stacking or racking over 8m high, free- movement areas and transfer areas.


Contact our concrete contractors

We are the leading concrete flooring contractors in the UK, offering outstanding concrete finishing results with every project. For more information about our services, contact our team today on 01590 676 585.

This site uses some unobtrusive cookies to store information on your computer. By using our site you accept our Terms And Conditions and Privacy Policy. ×